Case Study
9.28kW PV Silevo Triex U_Series 290 Watt in Clarence, NY
RESIDENTIAL SOLAR IN CLARENCE
View from the south side of Clarence residence. This image was created using EagleView Technologies aerial photography
CIR INSTALLS SOLAR AT NATALE BUILDERS OFFICE BUILDING
NATALE OFFICE BUILDING
Over the life of this system 406 tons of carbon dioxide (CO2) will be eliminated from Natale's footprint.

406 Tons of CO2 is Equivalent to planting 2,030 trees or reducing driving by 812,000 auto miles.
View Case Studies...
<< To Case Study List

RE-LIGHTING THE ERIE CANAL

NIAGARA COUNTY CANAL LIGHTING

COUNTY OF NIAGARA DEPARTMENT OF PUBLIC WORKS

Overview

Feigle/Fisk Hydra Platform Lift
CIR installs navigation lighting and service upgrades at Feigle/Fisk and Carmen Road Bridges over the Erie Canal.

Project Details

  • Completed: May 2010
  • Owner: County of Niagara Department of Public Works
  • Location: Niagara County, NY
  • Engineer: Erdman Anthony & Associates, Inc.
  • CIR Project Manager: Tom Jachimowicz
  • CIR Foreman: Mike Popp

Category

Institutional

Job Highlights

CIR replaced the navigation lighting and service at both the Feigle/Fisk and Carmen Road Bridges over the Erie Canal in Niagara County.  All new wiring, navigation lights and electrical service were installed at both bridges.  The Feigle/Fisk Bridge also had a brand new conduit system installed, requiring the use of a Hydra Platform Lift to replace conduit under the bridge.