LOW RISE ELEVATOR MODIFICATIONS & FIRE ALARMS
Overview
City Hall called on CIR ELectrical to renovate the existing low rise elevator and fire alarms sytems.
Project Details
Customer: City of Buffalo
Dates: November 2003 - November 2004
Engineer: DiDonato Associates, P.E. P.C.
Project Manager: Jim Gardner
Foreman: Kevin Neff
Location: Buffalo, NY
Category
Institutional
Overview of Job
This job consisted of the complete renovation of the existing elevator machine rooms on the 14th and 26th floors. The fire alarm system was also updated in the machine rooms and in the 26 elevator lobbies. CIR installed more than 2000 feet of new feeder conduit and over 8000 feet of feeder wire to complete this project.
***Special Thanks to Rick Sacco for his tour of the facility.